Manufacture and installation of MakBoxPro local wastewater treatment plant with a capacity of 12 m³/day. Yaremche, Ivano-Frankivsk region

MakBoxPro Autonomous sewage

The manufacture and installation of an autonomous MakBoxPro sewage treatment plant with a capacity of 12 m³ for a retreat house in Yaremche, Ivano-Frankivsk region has been completed. There will be approximately 60 children of resettlers.

The manufacture and installation of an autonomous MakBoxPro sewage treatment plant with a capacity of 12 m³ for a retreat house in Yaremche, Ivano-Frankivsk region has been completed. There will be approximately 60 children of resettlers.

We dealed with a client who was faced with a problem – the existing treatment facilities (we don`t specify any manufacturer) were out of order. The client decided to promptly replace the equipment. Which we did. Manufacture, delivery, installation, and commissioning took a total of 10 working days.

Client`s feedback is here.

The MakBoxPro stand-alone sewage treatment plant was installed in a reinforced concrete well, in which previous non-working sewage treatment plants were placed.

The MakBoxPro stand-alone sewage treatment plant was installed in a reinforced concrete well, in which previous non-working sewage treatment plants were placed.

The MakBoxPro station is equipped with a UV disinfection lamp. Diascharge of water to the drainage system.

Why Aquapolymer Engineering is better:

  1. We are client-oriented – if it is needed urgently, we will definitely do our best.
  2. Our treatment facilities are quality – the degree of purification is up to 98%.
  3. All the necessary documents are available – Conclusions of the State Sanitary and Epidemiological Authority and permits.
  4. We provide a 3-year guarantee for treatment plants.
  5. We provide MakBox service and maintenance.

Order an autonomous sewage system

To get consultation on autonomous sewage treatment plants, call no. 067 245 88 89