Production of sewage pumping station for the hotel in Skhidnytsia village

The sewage pumping station (SPS) is designed for pumping of domestic wastewater to the city sewerage system.

The principle of operation of the sewage pumping station (SPS)

Domestic wastewater through the network of self-flowing pipelines enters the SPS, which is an underground cylindrical tank with 2 submersible pumps. Submersible drainage pumps are switched on and off automatically according to the positions of the float switches.

Overall dimensions of the tank of SPS which we made:

  • Diameter 1.6 m
  • Depth 5.5 m

Underground type

Overall dimensions of the tank of SPS which we made:

  • Diameter 2.0 m
  • Depth 3.0 m

The installation took place in the. Skhidnytsia village

The warranty period for our SPS is 3 years (for separate electrical equipment, which SPS is equipped with – a guarantee, according to the manufacturers.